Quality Assurance Policy
Statement
FELISON TECH. & GENERAL SERVICES
LIMITED is service – oriented in operation. Therefore, it is
the objective of management to ensure that QUALITY is given
first-rate priority in all our services to our clients. This
will bolster clients ’ confidence, generate more jobs and
hence promote organizational growth and workers ’ welfare.
In order to achieve this objective, Management has
formulated the following guidelines for efficient and
effective quality assurance policy, its enforcement and
control.
1. The overall company activities,
products and services and operations shall be concentrated
on meeting and satisfying the quality standards and
requirements of our clients.
2. Our quality standards shall compete
favourably in the open market situation.
3. Our operations, services and products
must always meet the relevant codes of practice, statutory
regulations, requirement and international standard
codes.
4. Adequate and proper control measures
for continuous improvement on our services, products and
operations shall always be put in place.
5. Quality deviations and variations
caused by tool wear, defective or obsolete equipment and
substandard materials shall be effectively checked by
adequate performance indicators and review standards in
accordance with the rules and regulations of the standard
organization of Nigeria for us to achieve success in our
organizational objectives, it is essential that all
employees must be involved. In this regard, there shall be a
continuous re-orientation of the work staff towards quality
assurance in work methods, procedures and
processes.
6. Internal
Auditors are to ensure compliance with set standards,
procedures and processes: external auditors shall enforce
compliance by sub-contractor.
7. It is the
Company management policy in order to reduce wastage and
ensure profitability, quality assurance planning shall
start at the pre-contract phases through to the
completion stages.
8. Training and
Instructions are imperative for all staff so as to
implement quality assurance. All our employees are
normally given three months training on quality control
as soon as they are engaged.
9. The
implementation of our quality assurance policy, quality
control and guideline are the responsibility of every
level of management in Felison Tech. & General
Services limited
10. Line
management shall highlight result of implementing quality
assurance policy; results are to be displayed employing
performance indicators.
11. Management
shall appoint a small unit on her behalf to play a
supporting role in designing and setting up quality
control system.
Signed:
Felix Ejoh (B.Sc.
Mgt)
Managing
Director/CEO
QUALITY
CONTROL AND ASSURANCE
PROGRAMME
Quality Control Guidelines for
Engineering Services, Project Design/Maintenance and
General Contracts.
A. This programme
establishes a consistent system to effectively carry out
the execution of Mechanical Projects and services;
Electrical Engineering; Welding; Civil and Building
Engineering; Construction; Maintenance; transportation
and Logistics Services; Procurement services and General
Contracts.
A.1 A pre-tender meeting is usually
attended for the purpose of obtaining and confirming
scope of the project and the client ’ s perspective of
the job. This meeting is attended by either the Project
Engineer or any other Executive or relevant officer and
the quantity Surveyor or quality assurance officer as the
case may be. Decision taking in order to achieve the
scope of the job is firmly kept to the company so as to
meet the required standards.
A.2.1 The project execution planning
and methods/procedures are then tailored towards
achieving the client ’ s specifications, drawing and
general quality.
A.2.2 The project is then executed to
client ’ s specifications and in accordance with the
Quality Assurance Policy of Felison Tech. & General
Services limited.
A.2.3 Relevant codes of Practice,
Statutory regulations/requirements; international
standard codes/regulations (Viz ISO, IEC, IEE, DIN, NEMA,
NEC, OSHIA, BSS, ANSI, UL, AMCA, etc. are highlighted and
complied with by Felison Tech. & General Services
limited
A.3 A project-monitoring scheme is put
in place throughout the duration of the project. The
Project engineer/manager writes report about Quality of
jobs or services rendered to
clients.
A.4 Periodic in-house project review
and appraisal meetings shall be held at 30%, 60% and 90%
project completion phases. Weekly meetings of sectional
heads to review work progress against projected targets,
inter-discipline, and to set targets for the next week
period, shall always be held.
A.5 Client ’ s guidelines and comments,
the use and application of relevant standard and codes,
shall form the basis for project execution, review and
appraisal.
A.6 Felison Tech. & General
Services limited shall always and willingly incorporate
into its quality Policies any positive and progressive
suggestions from client to enhance the overall quality
and standard of job and or services being
rendered.
A.7 Project Completion stages shall be
checked and certified by disciplined Engineers or
relevant official of the company. This shall be
crosschecked by an engineer or another consultant who is
not part of the project being checked. This document
shall state the specification for the project, the
applicable / applied codes and standard of references
used. A copy of this document shall be sent to either the
Managing director or any other official of executive
relevant to take action in his place for review and
approval. The approved document shall bear the signature
of the Project Engineer or Official in charge. A copy
each of this document shall be distributed to the Project
Manager or Engineer in-charge, Clients ’ Project Engineer
or representative and the project file. This procedure
shall be employed and maintained for all stages of
completion till the final stage to ensure harmony and
quality assurance in all our
operations.
A.8 If any major changes are made in
the course of the project execution, such changes shall
be updated and effected on the relevant drawing and
initialed by appointed representative of both parties.
Once such changes in the job scope is approved Felison
Tech. & General Services limited shall adhere to
those changes on the job scope and perform
accordingly.
A.9 As may be required by the client,
the Project Engineer or manager of Felison Tech. &
General Services limited shall attend any project review
meeting called by client and any decision reached in such
a meeting shall be communicated to all staff of the
company.
B. QUALITY CONTROL
AUDIT In addition to the process controls enumerated
earlier, Felison Tech. & General Services limited
carries out an Audit of all its activities. Audits of the
Quality Control System, its processes and procedures are
audited to ensure true compliance by staff, and to
determine whether various elements of the system are
effective in achieving the objectives. In the course of
the quality Control Audit, if there is any variance in
quality, management shall immediately set up a panel to
find out why and corrective measures stimulated
accordingly to correct it.
C. DOCUMENT CONTROL
Only authorized personnel (Project Engineer or Manager
and CEO) shall issue documents to clients – such
documents shall be stamped with the company ’ s official
stamps or initialed by the person issuing only such
document of the company, clients shall honour only
document bearing the initials of the authorized personnel
and or seal of the company. The head of department is to
make quarterly review of documents with the aim of
removing and destroying any out of use or obsolete
documents. He shall also verify that the quality and
location of the documents are properly recorded. Felison
Tech. & General Services limited keeps a contract
file for all its clients who do business with the
company. It is the company ’ s policy to always give its
client up-to-date reports on the level of jobs executed
so far as may be requested by the
clients.
D. STOCK CONTROL An
awareness of stock control method is one of the company ’
s Quality Control Policies. The Pivotal concern of
Felison Tech. & General Services limited is to ensure
that stock is well preserved, that it is of an economic
quality and price and that stock is available as and when
required.
The functions of our Stock Controller
shall include:
D.1 Safeguard stock against
deterioration, loss damage or misuse. Especially where
the unit of stock is small, greater security shall be
exerted to guard against pilfering and
misappropriation.
D.2 Keeping stock at optimum economic
levels to avoid losses due to overstocking or under
stocking. D.3 Maintaining up-to-date and proper
book-keeping methods for all type of stock, its
movements, pricing and use of the stock. Facilities for
taking a physical stock check at short time periods shall
be provided.
E. CONCLUSION Felison
Tech. & General Services limited Quality Assurance
Policy and Control Guidelines which ensures that our
clients are served with high standard goods, products,
services and projects, which have been checked, tested
and confirmed to meet the specified standard. Our
numerous customers have lent credence to this by their
continual patronage We know that our Quality Assurance
Policy and Control guidelines will meet your demand or
requirement.
Logistics
Capability
The company orders and or supplies are
sometimes transported by third party contractors who are
regularly monitored and ensured that the safety policy of our
client is respected.
Procedure for
Non-conformity
1. A system is put in place that ensures work
in progress and or material supplied are checked where
appropriate and rectified whenever non conformity are
detected
2. The system also ensure that customers are
formally notified of corrective actions taken from
complaints
3. There are regular analysis of bench
marking carried out to identify areas requiring corrective
action
Operating Methods and
Procedures
1. There are written procedures to describe
procurement controls. So that purchased materials meets
requirements
2. Also materials test or certification and
quality data packages are reviewed for completeness and
compliance to purchase order
3. In addition, to method and procedures
enumerated earlier, Felison Tech. & General Services
limited personnel who perform critical activities are given
appropriate training as to equip them in their work
performance.
4. Also written inspection, testing
instruction that include characteristics to be inspected,
frequency of inspection, method and tools to be used, standard
of approval, rejection and disposition are also available for
use.
5. There are documented work instructions
that are clear, complete and regularly reviewed for all
appropriate operations and or purchases.
|